
***AGM Postponed till next Wednesday 6 May 2026 at 8:30pm***
About Us
We are located just off the R165 Bailieborough to Cavan Road.
We were founded in 1968
Our Treatment Plant was officially opened on the 12 February 2001 by Noel Dempsey TD
Our AGM is in April each year
The next AGM is Postponed till at 8:30Pm Sharp. Location A82 HK29

Our treatment plant and office
Where Our Water Comes From
- Our water is sourced from a spring feed lake, Lough Accury. This lake has over 30 springs, with no other inflow
- As the water leaves the lake it passes through screens to filter large items
- As it enters the treatment plant it passes through spin-klin(tm) unit to further filter the water
- The water is then passed through Carbon and sand filter as well as an ozone system
- Lastly Chlorine is added before the water is sent to the reservoir for storage and distribution for use
- The reservoir can hold 454 Cubic meters of water
- The full plant can produce 75 Cubic meters of Drinking water an hour

Part of the treatment plant